Geothermal Equipment Part 2
Loading completed in two and half days.
CARGO MOVERS AUST PTY LTD ships WDI RIG 828 from Portland Victoria to Thailand the rig was loaded onto the "MV DIJKSGRACHT" loading was completed in 2.5 days from the Port of Portland with an overall shipping volume of 8116m3.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |













